Follow Us:

Browse Flowering Elbow

Latest Blog Entries

Outside FE

Entry 12 – Fit the Purging Assembly

Working the pipes onto the driftwood end supports was quite fiddly and time consuming.  Some WD40 helped.

Once assembled, two bowline knots attach the rope to either anchor on the purging assembly, and we are good to go.

The assembly materials are gathered together ready.

Careful and slow – feeding through the pipes and working the end support into place.

The excitement of first testing of the AEAPD can not be described easily.

 

Previous Journal Entry Next Journal Entry

Add a Comment, Question or Musing

What is 3 + 7 ?
Please leave these two fields as-is:
To comment, answer the following, so we know that you are a human :-)